Contractor Near MeBay Area & Dallas–Fort Worth · free project requests Call (800) 953-8995

Kitchen remodeling

Plan a kitchen remodel with the right kind of contractor

A kitchen is the room where the most trades meet in the smallest space: cabinets, counters, tile, plumbing, wiring, sometimes walls and windows. Send us a short note about the kitchen you have and the one you want, and we call you back to sort out what kind of licensed contractor the job calls for. Sending the request costs nothing.

Is it a layout change or a cosmetic refresh?

The first question is whether anything moves. A cosmetic refresh keeps the sink, range, refrigerator and walls where they are and swaps the surfaces around them: new cabinet doors or boxes in the same footprint, new counters, a new backsplash, paint, lighting fixtures on the existing boxes, and new appliances in the same openings.

A layout change moves things. The sink goes to an island, the range moves to another wall, a wall comes down to open the kitchen to the dining room, or a window is widened. Each move pulls in more work behind the walls and under the floor: new drain and supply lines, a gas line or a new circuit for the range, a vent hood ducted to the outside, and sometimes a beam where a wall used to carry weight.

Knowing which kind you are planning shapes everything after it: who should draw the plan, whether the city wants to review it, which license fits the contractor, and how long the kitchen will be out of use.

Which trades does a kitchen remodel touch?

Even a modest kitchen job often crosses several lines on the Contractors State License Board's list of license classifications:

When the job is only one of those, a specialty contractor in that trade is often the natural fit: a tile setter for a new backsplash, or a cabinet shop for new doors and drawer fronts.

Who should run a full kitchen remodel?

For a remodel that combines plumbing, electrical and carpentry under one contract, CSLB's own guide, What Type of Contractor Do I Need?, points homeowners to a B, General Building contractor. A B contractor can sign the whole job, coordinate it, and bring in licensed specialty contractors for the trades it does not perform itself.

There is also a B-2, Residential Remodeling license, made for improvements to an existing wood-frame home when a contract covers at least three unrelated trades. Its CSLB description rules out structural changes to load-bearing walls, foundations and roof framing, and substantial new plumbing, electrical or mechanical systems unless a properly licensed contractor does that part. So if your plan removes a bearing wall or reroutes the drain lines, ask how that part of the work will be licensed.

A kitchen remodel is almost always well past the $1,000 point where California requires a licensed contractor. Our guide on checking a contractor's license walks through the lookup step by step.

Does a kitchen remodel need a permit?

It depends on what you change, and your city decides. Replacing a countertop in place is a very different request from moving a sink, adding circuits or taking out a wall, and the building department is the place that draws that line for your address.

Bay Area cities each run their own building or permit center with their own rules. In Dallas, the city names remodeling a kitchen as one of its own examples of work a residential permit covers, and applications go through its DallasNow portal. Elsewhere, ask your city's building department. Whatever the city, it is reasonable to ask the contractor to pull the permits and to make the final inspection part of the contract.

In what order does a kitchen remodel come together?

Most kitchens follow the same sequence, and knowing it helps you see where decisions are needed and when.

  1. Measure and decide the layout. Appliance sizes come first, because cabinets are built around them.
  2. Choose cabinets and order them early. Custom and semi-custom boxes can take a while to arrive.
  3. Permits, if the city requires them for your scope.
  4. Demolition and protection of the rest of the house from dust.
  5. Rough plumbing, gas and electrical inside the open walls, then the inspection of that rough work where one is required.
  6. Insulation, drywall and patching.
  7. Cabinets go in. Counters are usually templated after the base cabinets are set, then fabricated and installed.
  8. Backsplash tile, fixtures, appliances, paint and trim.
  9. Final inspection and a walk-through list of anything left to finish.

Changes late in that order cost more than changes early, because finished work has to come back out. Deciding the layout and the appliances before demolition saves most of the surprises.

What to have ready before you call

Questions to ask a kitchen contractor

Before you sign, read our guide to California home improvement contracts. In short, a contract over $500 has to be written, and the deposit is capped at 10 percent of the price or $1,000, whichever is smaller, per CSLB's contract rules.

What we do, and what we don't

We take your kitchen request at no charge, then call or email you to go over the layout you have in mind, which kind of licensed contractor fits it, and what to ask before you sign. We are not a kitchen contractor. We hold no contractor's license, we do not design or build kitchens, and we do not give prices, set schedules or stand behind anyone you choose to hire. Look up every license yourself on CSLB's site.

Tell us about the project

A short note is enough. We call or email you back about it; the request is free and you owe nothing for it.

Kitchen remodeling questions people ask

Can I buy my own cabinets and appliances?

Many homeowners do, and many contractors will install what you buy. Settle in writing who orders each item, who receives and inspects it, who stores it, and who is responsible if a piece arrives damaged or late. Those details belong in the contract or a written change order.

Can a cabinet installer also move my sink or add outlets?

Not on a C-6 cabinet license alone. Moving drain and water lines is plumbing work, a C-36 classification, and new circuits are electrical work, a C-10. A B general building contractor can take the whole job when it combines several trades and bring in licensed specialists for those parts.

How do people cook while the kitchen is torn out?

Most set up a small temporary kitchen in another room: the refrigerator moved and plugged in, a microwave or hot plate, a folding table and a utility sink or bathroom for washing up. Ask the contractor early which day the old kitchen goes out and when water will be back on.

Sources: CSLB, What Type of Contractor Do I Need?; CSLB, License Classifications; CSLB, B-2 Residential Remodeling Contractor; CSLB, AB 2622 minor work exemption bulletin (2024); CSLB, Contracts and Binding Agreements; City of Dallas, Residential Permits.